To renovate the whole kitchen room due to water damage. We removed the old kitchen. We took off the plasterboard from the walls and ceiling. We installed air tightness membrane. We put new plasterboard and skimmed the walls and ceiling. We fit a new kitchen. We painted the room.
The old laminate was damaged So we fitted new laminate that was thinner on the floor. Our steps: We removed old laminate and trims. We installed the underlay. We fitted new laminate and trims.
To renovate the kitchen. We removed the old kitchen. We fit a new kitchen gloss finish.
To paint the outside of the house. We sanded and swept the exterior. We painted with weather shield paint.
We had to break the concrete slab above the kitchen firsthand so that we can suspend the house with steel beams for the open space. We then fit a new fiberglass roof with a flat roof window. Lastly we fitted new glued laminate with new doors and windows and painted all the bottom interior of…
To fit new tiles in the balcony. We took off the old slabs. We cleaned the balconies. We put floor leveling in the balconies. We installed new tiles.
To make a new fence. We built a new fence with treated timber 2 x 1.
To make a new office. We made new timberframes 3 x 2. We put rockwool insulation in the walls.
To make an extension on the first floor. Outside: We made new timberframe studs 6 x 2, with OSB 3 and cement board. Inside: We installed air tightness membrane. We put rockwool insulation 150mm in the walls and ceiling. We put plasterboard on the ceiling and insulated plasterboard on the walls.