The old timber deck was very rotten and slippery due to its old age. It was very dangerous. Therefore, there had to be a new deck composite installed. Our steps: We got rid of the old deck. We leveled the soil. After that, we put a concrete post, to anchor the treated timber frame. We…
The old timber deck was very rotten and slippery due to its old age. It was very dangerous. Therefore, there had to be a new deck composite installed. Our steps: We got rid of the old deck. We leveled the soil. After that, we put a concrete post, to anchor the treated timber frame. We…
The old timber deck was very rotten and slippery due to its old age. It was very dangerous. Therefore, there had to be a new deck composite installed.Our steps: We got rid of the old deck. We leveled the soil. After that, we put a concrete post, to anchor the treated timber frame. We put…
The owner wanted to put a engineered laminate on his floor. So we only fitted the engineered laminate on his flooring. Our steps: We installed sound reduction underlay. We fitted the engineered laminate with glue. We fitted new skirting, architraves and trims.
The construction needed first fixing. Ground Floor: We made new timberframes 4 x 2. We put OSB 3 for the floor. First Floor and Extension: We made new timberfames 9 x 2. We put OSB 3 for the floor. Second Floor: We put new timberfames 9 x 2. We put OSB 3…
We made a flat roof on top of a garage conversion. We made a new timberframe 6 x 2. We installed filling pieces for drainage. We put OSB 3. Torch on Felt was put afterwards.
Owner wanted to conver the garage into an office. We suspended the ceiling. We broke down the wall. We fitted the steel beam to support the roof. We made a window frame. We insulated the wall with 73mm insulated plasterboard and skim. We changed normal light with led spotlights.
To re design a garden. We cleared all bushes, twigs, trees and anything else and threw it in skip. We leveled the soil. We put weed control, hardcore and paving sand in order to make a footpath. We put flabs. In the middle, we made level with paving sand and fitted artificial grass.
To renovate the garden. We cleared most of the bushes, twigs, trees and threw in skip. We made new footpaths with slabs and space for the flowers. We made space for a new shed. We placed decoration pebbles in some parts and chippings in others. We closed the back garden with new fences.