The construction needed first fixing.
Ground Floor:
We made new timberframes 4 x 2.
We put OSB 3 for the floor.
First Floor and Extension:
We made new timberfames 9 x 2.
We put OSB 3 for the floor.
Second Floor:
We put new timberfames 9 x 2.
We put OSB 3 for the floor.
Roof:
We put a steel beam in the centre and made a new timberframe 6 x 2.
Project Details
- Category: Carpentry
- Location: Dublin 3, Ireland
- Completed Date: 2020